Westbrook, CT (Main Office) Brewer Yacht Sales
UsedPower
West Palm Beach , Florida, United States
2022

Sportsman 35' 352

"Change Order"

$294,500 USD
$413,109 CAD
35'Length
11'2"Beam
Gas/PetrolFuel Type
FiberglassHull
Center ConsolesCategory

2022 Sportsman 352 Center Console with twin Yamaha 425s, low hours less than 300, extended engine warranty, dual Garmin 22” displays, JL Audio system, loaded fishing features. Includes berth, electric bow table, dual livewells, and premium finishes.

HIN/IMOVHB37511L920

Overview

For Sale: 2022 Sportsman 352 Center Console – Twin Yamaha 425s Low Hours and Extended Warranty

This 2022 Sportsman 352 is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425s with digital electric steering. Built for serious performance and all-day comfort, it blends innovative tech, high-end finishes, and serious fishability.

Electronics & Helm:

  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13” stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apollo™ stereo + remote
  • Airmar B175M CHIRP transducer

Fishing & Deck Features:

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler

Comfort & Layout:

  • Triple premium captain’s chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery

Build & Utility:

  • 355-gallon fuel tank
  • 35-gallon freshwater tank w/ washdown
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400’ line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty

This 35’ center console is turnkey and ready for anything—whether you’re heading offshore or entertaining at the sandbar. Loaded with features, meticulously kept, and built to perform. Extended engine warranty


Brewer Yacht Sales is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

Specifications

Dimensions

Length Overall35' 2"
Display Length35'
Beam11' 2"
Draft2' "

Details

Year2022
CategoryCenter Consoles, Saltwater Fishing
TypePower
Hull MaterialFiberglass

Accommodation

Heads1

Performance

Fuel TypeGas/Petrol
Cruise Speed37.8 MPH

Weight

Dry Weight9,850 lbs

Tank Capacities

Fuel330 gal
Fresh Water35 gal

Registration

HINVHB37511L920

Photos55 images

Engines

Engine 1Yamaha XF425NSA2
Engine Year2022
Engine TypeOutboard
Power HP569.93
Power KW425.00
Hours250
Engine 2Yamaha XF425NSA2
Engine Year2022
Engine TypeOutboard
Power HP569.93
Power KW425.00
Hours250

Full Details

Electronics and Helm

Electronics & Helm:

  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13” stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apollo™ stereo + remote
  • Airmar B175M CHIRP transducer


Fishing & Deck Features

Fishing & Deck Features:

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler


Comfort and Layout

Comfort and Layout

  • Triple premium captain’s chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery


Build & Utility

Build & Utility:

  • 355-gallon fuel tank
  • 35-gallon freshwater tank w/ washdown
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400’ line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty


Listing MLS by Yachtr.com

Videos

35 Sportsman

Interested in this Sportsman?

Send us a message and we'll get back to you within 24 hours

Inquiring About:2022 Sportsman 352
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.