Westbrook, CT (Main Office) Brewer Yacht Sales
UsedPower
Destin, Florida, United States
1994

Hatteras 46' 46 Convertible

"Change Order"

$175,000 USD
$241,123 CAD
46'Length
15'Beam
2Cabins
DieselFuel Type
FiberglassHull
Convertible BoatsCategory

For Sale

Highlights & Features

Full Engine & Transmission Service- 2025
New Batteries- 2024 STBD/ 2025 PORT
New Interior Floor Covering
HIN/IMOHATFD710A494

Overview

1994 46' Hatteras 46 Convertible "CHANGE ORDER" For Sale- Introducing the Tournament Rigged and Ready to Fish aptly named "CHANGE ORDER." This stunning vessel is not only built for durability but also equipped to ensure your success on the open waters. With the powerful Twin Detroit 8V92TA engines, boasting only 1,000 hours since their rebuild, you can expect reliable performance, cruising comfortably at 18 knots and hitting a top speed of 25 knots. What sets "CHANGE ORDER" apart is its extensive range of fishing gear, designed for serious anglers and casual fishermen alike. The fighting chair, teaser reels, and ample rod holders are complemented by a spacious cockpit, allowing for easy maneuvering while reeling in your catch. The updated electronics provide essential navigation and fishing assistance, enhancing your overall experience. Inside, the two staterooms with two heads provide ample space for overnight trips or weekend getaways, ensuring comfort during your adventures. The large salon creates a welcoming area to relax and entertain guests. For those who prioritize both performance and comfort, this Hatteras model is a remarkable vessel, ready for your next bluewater fishing expedition.


Dunigan Marine Group is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Galati Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

Specifications

Dimensions

Length Overall46' 0"
Display Length46'
Beam15' "
Draft4' 5"

Details

Year1994
CategoryConvertible Boats
TypePower
Hull MaterialFiberglass

Accommodation

Cabins2
Heads2

Performance

Fuel TypeDiesel

Weight

Dry Weight52,000 lbs

Registration

HINHATFD710A494

Photos74 images

Engines

Engine 1Detroit Diesel 8V92TA
Engine TypeInboard
Power HP735
Power KW548.09
Serial Number08VF155637
Engine 2Detroit Diesel 8V92TA
Engine TypeInboard
Power HP735
Power KW548.09
Serial Number08VF155623

Generators

Generator 1Onan 150MDKAD
Generator KW15.00
Hours5040

Full Details

Recent Updates

  • 2025 Port Batteries Replaced
  • 2025 Full Engine & Transmission Service
  • 2025 New Interior Floor Covering
  • 2025 New Fresh Water Pump
  • 2024 Starboard Batteries Replaced
  • 2024 New Salon AC
  • 2024 New Teaser Reels
  • 2024 Outrigger Line Replaced
  • 2024 New Livewell Pool Pump
  • 2024 New Wall Upholstery
  • 2024 Fighting Chair Reupholstered
  • 2023 New Isinglass Enclosure
  • 2023 New Cutlass Bearings
  • 2023 Props Tuned by CompuProp
  • 2023 Starlink
  • 2023 Full Bottom Job

Flybridge

  • Starlink
  • Garmin Radar
  • Simrad Autopilot
  • Simrad Cmore Maps
  • Garmin 7608XSV GPS
  • Garmin 7212 GPS
  • Dual Digital Detroit Gauge System
  • Ritchie Compass
  • Standard Horizon VHF
  • Icom IC-M127 VHF
  • ACR Remote Spotlight
  • Fusion Stereo XM
  • Teaser Reels Manual
  • Spreader Lights
  • 12 Rod Holders on Rail

Cockpit

  • Engine Room Entry Door
  • Fighting Chair
  • Fishbox In Deck
  • Port, Starboard, and Center Outriggers
  • Port and Starboard Gaff & Brush Storage Holders
  • Livewell
  • Extended Cockpit Sun Shade
  • Full Cockpit Sun Cover
  • Deck Sink
  • Stainless Dive Ladder
  • Underwater Lights


Bow

  • Windlass Anchor
  • Life Raft & Hard Box Container (with up-to-date certification)

Salon

  • Refrigerator and Freezer
  • Microwave
  • Insignia Sound System & TV

Disclaimer

The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.

Listing MLS by Yachtr.com

Interested in this Hatteras?

Send us a message and we'll get back to you within 24 hours

Inquiring About:1994 Hatteras 46 Convertible
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.