Hero Image background

2015 Sunseeker 68' (20.73 m) Predator 68

Knoxville, Tennessee, United States

Change Order II

The Sunseeker design hull and deck provide an impressive soft ride sensation. She is the perfect combination of excitement and relaxation and designed to offer flexible space both inside and out which coupled with the sliding hard top over the main deck saloon adds tremendous versatility.

PDF
Vessel ID#     Last Updated: 2025-02-23 11:50:33

Description


Brewer Yacht Sales is pleased to assist you in the purchase of this vessel. This boat is centrally listed by HBG Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

Specifications

HIN/IMO: GBXSK06412A515

LOA: 71' (21.64 Meters)

Type: Power- Used

Year: 2015

Beam: 16' 9''

Heads: 3

Fuel Type: Diesel

Hull Material: Fiberglass

Fuel Tank: 925 Gallons (3501.5 Liters)

Fresh Water: 211 Gallons (798.72 Liters)

Holding Tank: 200 Gallons (757.08 Liters)

Gross Tonnage: 82209

Photos click to view all

Engines

Engine 1

  • Engine Make: Man
  • Power HP: 1200.00
  • Power KW: 894.84
  • Hours: 865.00

Engine 2

  • Engine Make: Man
  • Power HP: 1200.00
  • Power KW: 894.84
  • Hours: 865.00

Full Details

Listing MLS by Yachtr.com

Contact Us

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form
Change Order II 68ft Sunseeker Yacht For Sale

Brewer Yacht Sales

Office: 1 860 399-6213
Email: info@breweryacht.com

Our Yacht Sales Professionals share your passion for the boating lifestyle. They are knowledgeable in all facets of the industry and each Brewer broker is a member of the Yacht Brokers Association of America, (YBAA). With great pride we have many brokers that have earned their Certified Professional Yacht Broker, (CPYB) accreditation!