2006 Sea Ray 32' (9.75 m) 320 Sundancer
Honolulu, Hawaii, United States
Change Order
There's nothing quite like the exhilarating profile of this sleek 320 Sundancer. Its dramatic lines and bold colors make everything else look like it's sitting still.
- Cruisers
- Power
- Used
- Gas/Petrol
- Fiberglass Hull
- HIN/IMO: SERT7780K506
Description
Exciting features include cockpit wet bar with Corian counter, extra-wide bench-style helm seating with two flip-up thigh-rise bolsters, optional underwater swim platform lighting, premium cabin surround sound, and lots more.
Brewer Yacht Sales is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Honolulu Yacht Brokerage. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel
Specifications
HIN/IMO: SERT7780K506
LOA: 35' 6'' (10.82 Meters)
Type: Power- Used
Year: 2006
Beam: 11' 5''
Draft Max: 3' 7''
Draft Min: 2' 9''
Heads: 1
Fuel Type: Gas/Petrol
Deadrise: 21
Hull Material: Fiberglass
Fuel Tank: 200 Gallons (757.08 Liters)
Fresh Water: 40 Gallons (151.42 Liters)
Holding Tank: 28 Gallons (105.99 Liters)
Photos click to view all
Engines
Engine 1
- Engine Make: MerCruiser
- Engine Model: MAG MPI
- Engine Type: Inboard
- Drive Type: Direct
- Power HP: 350.00
- Power KW: 261.00
- Fuel Type: Gas/Petrol
- Engine Location: Port
Engine 2
- Engine Make: MerCruiser
- Engine Model: MAG MPI
- Engine Type: Inboard
- Drive Type: Direct
- Power HP: 350.00
- Power KW: 261.00
- Fuel Type: Gas/Petrol
- Engine Location: Starboard
Full Details
Overview
Manufacturer Provided Description
There's nothing quite like the exhilarating profile of this sleek 320 Sundancer. Its dramatic lines and bold colors make everything else look like it's sitting still. Exciting features include cockpit wet bar with Corian counter, extra-wide bench-style helm seating with two flip-up thigh-rise bolsters, optional underwater swim platform lighting, premium cabin surround sound, and lots more.
Disclaimer
The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.
Listing MLS by Yachtr.com
Contact Us
"*" indicates required fields
Brewer Yacht Sales
Office: 1 860 399-6213
Email: info@breweryacht.com
Our Yacht Sales Professionals share your passion for the boating lifestyle. They are knowledgeable in all facets of the industry and each Brewer broker is a member of the Yacht Brokers Association of America, (YBAA). With great pride we have many brokers that have earned their Certified Professional Yacht Broker, (CPYB) accreditation!